TASKSET 8 - Production Deployment: Strategic Build Plan
Status: 🚀 READY FOR EXECUTIONTarget Date: December 5, 2025
Authority: CTO Approval
Duration Estimate: 6-8 hours
Executive Summary
TASKSET 8 delivers production-ready deployment infrastructure for the RELAY orchestration layer. Building on TASKSET 6 (4,278 LOC RELAY code) and TASKSET 7 (25 integration tests, 100% pass rate), this taskset provides:- ✅ Docker containerization with multi-stage builds
- ✅ Kubernetes manifests (dev, staging, production overlays)
- ✅ Helm charts for templated deployments
- ✅ CI/CD pipeline (GitHub Actions)
- ✅ Monitoring stack (Prometheus, Grafana, Jaeger)
- ✅ Distributed logging (ELK/Loki)
- ✅ Health checks and observability
- ✅ Production readiness validation
Architecture & Scope
What We’re Deploying
Integration Points
- SIFT: Quality assessment service (routes document edits)
- CAST: Semantic tagging service (routes annotations)
- SPAWN: Metadata extraction (event enrichment)
- STITCH: Content coordination (document sync)
Multi-Stage Build Plan
Stage 0: Strategic Blueprint (CURRENT)
Goal: Define multi-stage deployment strategyPhase 1: Container & Orchestration (2-3 hours)
- Dockerfile: Multi-stage Go build optimization
- docker-compose.yml: Local development environment
- Kubernetes manifests: Base deployment configuration
- Kustomize overlays: Environment-specific configs (dev, staging, prod)
Dockerfile(optimized for Go, <100MB final image)docker-compose.yml(dev environment)k8s/base/(shared k8s resources)k8s/overlays/{dev,staging,production}/(environment overrides)
Inputs: TASKSET 6 code, TASKSET 7 tests
Outputs: Container image ready for deployment
Phase 2: Observability Stack (2-3 hours)
- Prometheus: Metrics collection from /metrics endpoint
- Grafana: Visualization dashboards
- Jaeger: Distributed tracing
- Loki: Log aggregation
- AlertManager: Alert routing
monitoring/prometheus-config.ymlmonitoring/grafana-dashboards.jsonmonitoring/jaeger-config.ymlmonitoring/loki-config.ymlmonitoring/alert-rules.yml
Inputs: SLA metrics (500+ ops/sec, P95 <100ms)
Outputs: Full observability stack
Phase 3: CI/CD Pipeline (1-2 hours)
- GitHub Actions: Build, test, push, deploy workflow
- Build: Compile Go code, run tests
- Test: Integration + performance tests
- Push: Docker image to registry
- Deploy: Kustomize to target environment
.github/workflows/ci.yml(build & test).github/workflows/cd-staging.yml(staging deploy).github/workflows/cd-production.yml(production deploy).github/workflows/performance-test.yml(SLA validation)
Inputs: Git triggers, environment secrets
Outputs: Automated deployment pipeline
Phase 4: Validation & Verification (1 hour)
- Integration tests: 7 tests from TASKSET 7 ✅
- Performance tests: 6 benchmarks from TASKSET 7 ✅
- Failure scenarios: 12 tests from TASKSET 7 ✅
- SLA validation: Automated SLA assertions
- Production checklist: Pre-deployment validation
tests/production-validation-suite.go(new)scripts/pre-deployment-checklist.shTASKSET8_PRODUCTION_READINESS_REPORT.md
Inputs: All TASKSET 7 tests + new validation tests
Outputs: Production readiness certification
Implementation Strategy
Parallelizable Components
Efficiency Rationale
- Container first (Phase 1): Enables everything else
- Observability parallel (Phase 2): Independent of code
- CI/CD after container (Phase 3): Builds on Phase 1
- Validation last (Phase 4): Verifies all previous work
Key Deliverables
1. Container & Orchestration (Phase 1)
Dockerfile
Kubernetes Base Configuration
Environment Overlays
Development (k8s/overlays/dev/)
- 1 replica
- 200m CPU request
- 256Mi memory request
- Debug logging enabled
- Trace sampling: 100%
k8s/overlays/staging/)
- 2 replicas
- 500m CPU request
- 512Mi memory request
- Info logging level
- Trace sampling: 50%
k8s/overlays/production/)
- 3 replicas (minimum HA)
- 1000m CPU request
- 1Gi memory request
- Warn logging level
- Trace sampling: 10%
- Pod Disruption Budget: minAvailable=2
- Network Policies: Strict ingress/egress
2. Observability Stack (Phase 2)
Prometheus Metrics Collected
Grafana Dashboards
- Overview: System health, throughput, latency
- Events: Event publishing, routing, processing
- Sessions: Active sessions, user connections
- Performance: P95/P99 latencies, throughput
- Errors: Error rates, error types, stack traces
- Resources: CPU, memory, goroutines, file descriptors
Jaeger Integration
- OpenTelemetry instrumentation
- Trace sampling (configurable per environment)
- Service-to-service traces
- Latency visualization
Alert Rules (AlertManager)
3. CI/CD Pipeline (Phase 3)
GitHub Actions Workflows
Build & Test (.github/workflows/ci.yml)
.github/workflows/cd-staging.yml)
.github/workflows/cd-production.yml)
4. Production Validation (Phase 4)
Pre-Deployment Checklist
Production Validation Tests
Success Criteria
Functional Requirements
- ✅ Docker image builds successfully (<100MB)
- ✅ Kubernetes deployment runs in all 3 environments
- ✅ Health checks pass consistently
- ✅ All 25 integration tests pass in production
- ✅ Metrics exported to Prometheus
- ✅ Traces visible in Jaeger
- ✅ Logs aggregated in Loki
- ✅ CI/CD pipeline triggers on push/release
Performance Requirements
- ✅ Event throughput: >500 ops/sec
- ✅ P95 latency: <100ms
- ✅ P99 latency: <150ms
- ✅ Session join rate: >100 joins/sec
- ✅ Memory: <500MB per pod
- ✅ CPU: <500m per pod (avg)
Reliability Requirements
- ✅ Uptime: >99.9% (measured)
- ✅ Pod restart time: <10 seconds
- ✅ Graceful shutdown: <30 seconds
- ✅ All critical alerts firing correctly
- ✅ Runbook covers all operational scenarios
Security Requirements
- ✅ Container image scanned for vulnerabilities
- ✅ Network policies restrict traffic
- ✅ RBAC configured properly
- ✅ Secrets managed via Kubernetes Secrets
- ✅ Audit logging enabled
- ✅ TLS/mTLS configured
Timeline
Stage 0 → Stage 1 Approval Gate
Checklist for User Approval:- Strategic plan reviewed
- All 4 phases understood
- Parallelization rationale accepted
- Deliverables scope approved
- Success criteria validated
- Ready to proceed with Stage 1
Dependencies & Prerequisites
External Dependencies
- Docker runtime (local or CI)
- Kubernetes cluster (target environments)
- Container registry (Docker Hub / ECR / GCR)
- GitHub Actions enabled
- PostgreSQL database (RELAY uses GORM)
- Redis (optional, for caching)
Internal Dependencies
- ✅ TASKSET 6: RELAY code (4,278 LOC)
- ✅ TASKSET 7: Tests (25 tests, 100% pass)
- ✅ Go 1.21+ with modules
- ✅ Docker installed locally
Assumed Infrastructure
- Kubernetes 1.24+ (supports HPA v2)
- Container registry credentials configured
- DNS resolution for service names
- Persistent storage for logs/metrics (optional)
Risk Assessment & Mitigation
High-Risk Items
-
Container Image Size
- Risk: Image too large (>200MB)
- Mitigation: Multi-stage build, Alpine base
- Verification: Image scan confirms <100MB
-
Performance Regression
- Risk: Production deployment slower than tests
- Mitigation: Load testing before production
- Verification: Performance tests in CI/CD
-
Downtime During Rollout
- Risk: Zero downtime deployment fails
- Mitigation: Rolling updates with PDB
- Verification: Canary deployment test
Medium-Risk Items
-
Configuration Drift
- Risk: Overlays not properly layered
- Mitigation: Kustomize validation in CI/CD
- Verification: Dry-run before deployment
-
Observability Blind Spots
- Risk: Metrics/logs incomplete
- Mitigation: Dashboard validation checklist
- Verification: Load test with monitoring
Files to Create
Next Steps
Immediate (Today)
- Review and approve Stage 0 plan
- Confirm resource allocation
- Set up team communication channels
Upon Approval (Stage 1)
- Phase 1: Create Dockerfile, docker-compose, K8s manifests (2-3 hours)
- Phase 2: Set up Prometheus, Grafana, Jaeger, Loki (2-3 hours, parallel)
- Phase 3: Implement CI/CD workflows (1-2 hours, parallel)
- Phase 4: Run production validation (1 hour, after Phase 1-3)
Post-Deployment
- Monitor metrics in Grafana for 24 hours
- Validate alert routing
- Run load testing in production-like environment
- Document operational procedures
- Schedule team training
Questions for Approval
Before proceeding to Stage 1, clarify:- Container Registry: Where should images be pushed? (Docker Hub/ECR/GCR/Private)
- Kubernetes Cluster: Which cluster for dev/staging/prod? (EKS/GKE/AKS/Self-hosted)
- Monitoring Backend: Existing Prometheus/Grafana or new? (Cloud/Self-hosted)
- CI/CD Platform: GitHub Actions OK or different? (GitLab/Jenkins/CircleCI)
- Rollout Strategy: Blue-green, canary, or rolling? (Recommend: rolling with canary)
- Runbook Owner: Who maintains operational documentation?
Approval Gate
User Confirmation Required: Please confirm:- Plan is comprehensive and clear
- Timeline (6-8 hours) is acceptable
- Deliverables meet requirements
- Ready to proceed with Stage 1 → Phase 1
Document Created: December 5, 2025
Version: 1.0
Status: 🚀 READY FOR STAGE 1 EXECUTION